Snagging Inspection App – Basic Variant
The Basic variant is a simple and effective tool for carrying out technical inspections of apartments and houses. Designed for people who want to quickly document defects, prepare a clear report and hand it over to the client in an organised, professional form.The inspection report is generated in
DOCX or PDF format,
ready for archiving, printing or handing over to the investor.
For specialists who know what they want
The application has been designed with fieldwork in mind. It works just as well for individual inspections as for regular servicing of private and developer clients.- 🛠 technical and building inspectors
- 🏗 companies carrying out apartment and house inspections
- 🏢 developers handing over units to buyers
- 👷 private investors taking handover of properties
How does an inspection work in the Basic variant?
📸 Defect registration
During the inspection you add photos, descriptions and notes directly in the application – no chaos and no handwritten notes.📐 Assignment to rooms
Each defect is assigned to a specific room, which improves the readability of the report for the client.📄 Report generation
Once the inspection is complete you create a report in DOCX or PDF format – ready to use.Sample inspection report – see the template
See what a professional technical inspection report generated in the application looks like. The sample document presents an inspection of a 3-room apartment with 28 identified defects, complete photographic documentation and classification of defects as significant and non-significant.📥 Download sample report
Download PDF
Format ready to hand over to the client
Why do clients choose this type of report?
⭐ Clearly described defects and irregularities⭐ Photographic documentation in a single file
⭐ A readable format understandable to both the investor and the contractor
Benefits for you
⏱ Time savings
One inspection without rewriting notes and sorting photos.📂 Document order
Each inspection saved as a separate, complete report.
💼 Professional image
Consistent reports build trust and increase the value of the service.