Atsep.app

How to use the Atsep Inspection application?

Works on Android, iPhone, tablet and computer. No App Store installation required.

The Atsep application works as a PWA (Progressive Web App). It does not require installation from the Google Play Store or App Store and can be used:

  • on a phone (Android, iOS),
  • on a tablet,
  • on a computer in a web browser

Installing the application on Android

1. Open the Google Chrome browser on your phone.
2. Go to: https://atsep-inspection.web.app/
3. Log in using your Google account.
4. After logging in:

  • accept the “Add to Home Screen” prompt, or
  • tap the three dots (⋮) in the top right corner and select “Add to Home Screen”.

5. Confirm the installation.

The application will appear on your phone’s home screen and will work like a regular mobile app.

Installing the app on iOS (iPhone / iPad)

  1. Open the Safari browser (PWA installation on iOS only works in Safari).
  2. Go to:
    https://atsep-inspection.web.app/
  3. Sign in to the application using your Google account.
  4. Tap the Share icon (the square with an upward-pointing arrow).
  5. Select “Add to Home Screen”.
  6. Confirm that you want to add the application.

The Atsep-Inspection icon will appear on your iPhone or iPad Home Screen. From then on, you can launch the application directly from the Home Screen, and it will function similarly to a native iOS app.

Using the Application on a Computer

The Atsep-Inspection application can also be used without installation, directly in a web browser on your computer.

  1. Open one of the following web browsers:
    • Google Chrome
    • Microsoft Edge
    • Mozilla Firefox
  2. Go to:
    https://atsep-inspection.web.app/
  3. Sign in to your account.

The desktop version provides access to all key features, including:

  • project management,
  • editing project data and defects,
  • viewing documentation,
  • generating and downloading PDF and DOCX reports.